Owners
Manual (Older)
(Pic1 - Profile and Accommodations
Plan)
--2--
FOREWORD
This manual is intended to serve as a guide to the features and operation of the Catalina 25.
Before attempting maintenance or operation of your Catalina 25, please read the Catalina
Yachts Limited Warranty Booklet. Be sure your dealer has completed the registration card
contained within the booklet.
The initial launching and rigging of the Catalina 25 should be handled by experienced boat yard personnel under the direction of your authorized dealer. After the boat is launched, the dealer will complete the last phase of rigging and mast tuning as described in this manual.
This manual should be used in conjunction with the CATALINA GENERAL HANDBOOK which
discusses care and maintenance, and, also includes practical sailing and safety tips.
The last pages of this text contain a "Pre-Use Check List" and a "Pre Departure Check List". It will be useful to incorporate these checks into your sailing routine. A regular inspection is the best preventive maintenance, and will help keep your boat in good condition while in use and
insure peace of mind when the boat is left unattended.
CONTENTS
SPARS AND RIGGING
Stepping The Mast ...............................4
Rigging For Hoist Launching......................4
Tuning The Mast..................................5
Fine Tuning While Sailing .......................5 & 6
Rigging Specification Schedule...................7
Spar And Rigging Maintenance ....................8
SAILS
Catalina 25 Standard and Tall Rig Sail
Areas and Rig Dimensions ................9
ELECTRICAL SYSTEM
Batteries .......................................10
Battery Selector Switch..........................10
110 Volt Shore Power System .....................10
Lighting Wiring Schematic .......................11
Lamp And Circuit Schedule .......................11
Battery Selector Switch And 12 Volt Panel
Wiring Schematic ........................12
AUXILIARY POWER SYSTEM
Recommended Outboard Engine .....................13
Outboard Bracket.................................13
Fuel Storage ....................................13
TRAILERING ..............................................13 & 14
GENERAL OPERATION AND MAINTENANCE
Pop Top Operation................................14
Anchors And Anchoring ...........................14 & 15
Anti-Fouling Bottom Paint........................15
Electrolysis Protection..........................15
Keel Maintenance ................................15 & 16
U.S. C. G. Equipment Recommendations ............16
PLUMBING
Fresh Water System ..............................16
Ice Box Drain ...................................16
Marine Head......................................16 & 17
Holding Tank.....................................17
Seacocks ........................................17
Manual Bilge Pump................................17
PARTS AND ACCESSORY ORDERS ..............................18
CLOSING WORDS............................................18
CHECK LISTS
Before Leaving the Dock or Mooring ..............19
Before Leaving The Boat After Use ...............19
|