Home - Page  
Assn Members Area · Join



Water Level Sight Gauge


Easy Water Level Sight Gauge installation
by Al Maniccia. March 2006.
Skill level required: Not a lot.
Time to install: 1 hour.
Boat Status: Afloat or on trailer.

Materials:
  • Qty 2 of T's to connect hose to existing water lines.
  • Qty 2 of Brass Elbows for top and bottom of sight gauge.
  • Couple of feet of hose.
  • About 1' of Clear water pipe to connect the two elbows.
  • Small amount of sweat and toil.


Description: Self explanitory.
The gauge is installed in the cabin as shown below.

Installed so it's visible in the cabin (shown is fwd/stbd side of cabin)


Schematic of installation.